About Male 1987 Bangladesh ĐH Hà Nội English TOTAL 1571109768_cv_ha_hoang_cong_ha.pdf

  • Academic Level  Under Associate
  • Gender  Male
  • Languages  English
  • Old Provinces  Bắc Giang;Hưng Yên;Bắc Ninh;Đồng Nai;Hồ Chí Minh
  • Old YOB  1987-1991
  • Viewed 3

About me

CURRICULUM VITAE (CV)

1.
PROPOSED
POSITION
Project Manager
2.
NAME OF STAFF Hoang Cong Ha .Phone number : 0904113198 (0358820114)
3.
DATE OF BIRTH 02 Jan.1987
NATIONALITY:
Vietnamese
4.
EDUCATION
B Sc. In Civil engineering, Ha Noi University of Transportation and
Communication., 2010
5.
COUNTRIES OF
WORK
EXPERIENCE
Vietnam
6.
LANGUAGE
Speaking
Reading
Writing

English
Good
Good
Good

Vietnamese
Mother Tounge
Mother Tounge
Mother Tounge

7. EMPLOYMENT RECORD AND DETAILED TASKS ASSIGNED
7.1. WORKING FOR THE INVESTOR
From: Jun.2016
Employer

Position Held
To: Now
: Hung Hai Group – Joint stock company

: Project Manager
(1) Name of Assignment or Project: Project of
Khoai Chau infrastructure
Year: 2016 – 2017
Location: Hung Yen province, Vietnam
Client: Khoai Chau’s Community
Main Project Feature:
Shop drawing and working drawing design stage
Class : Civil engineering class
Area : 15ha
Contruction value: 300,000,000,000 VND

(2) Name of Assignment or Project: Project of Ho infrastructure
Year: 2017 – 2019
Location: Bac Ninh province, Vietnam
Client: Hung Hai Group – Joint stock company
Main Project Feature:
Shop drawing and working drawing design stage
Class : Civil engineering class
Area : 8ha
Contruction value: 100,000,000,000 VND

Position Held: Project Manager
Activities Performed:
– Control the Bill of Quantities.
– Manager cost control, quality control, payment and final settlement document.
– Supervise the Supervision consultants and the Contractor in the construction of site.
– Keep track of progress, records, review documents for payment to the contractors.
– Preparation of acceptance (approval) document.
7.2. WORKING FOR THE CONTRACTOR
From: Apr.2015
Employer

Position Held
To: May.2016
: Phuc Son Group – Joint stock company
: Site Manager

(3) Name of Assignment or Project: The road of international airport Cam Ranh
Year: 2015 – 2016
Location: Nha Trang province, Vietnam
Client: Management Authority for focus Khanh
Hoa
Main Project Feature:
Shop drawing and working drawing design stage
Class : Special class – TCVN4054-2005
Road : length of road is about 3 km
Contruction value: 1,000,000,000,000 VND

Position Held: Site Engineer
Activities Performed:
– Manager quality control, time control, monitoring construction site
– Calculate quantity and compare between designing and construction to give estimate the construction item; settlement of construction
– Preparation of acceptance (approval) document
– Separate drawing detail and monitoring construction.
– Collect all activities for surveying, project reporting.
– Record and check the daily construction diary reports for the assigned construction areas.
– Make the quality document, and coordinating with lab to check and take over the final category of work.

7.2. WORKING FOR DESIGN CONSULTANT
From: July.2010
Employer

Position Held
To: Mar. 2015
: Transport investment construction consultant – Joint stock company (TRICC-
JSC, HCMC Branch)
: Design Engineer
(4) Name of Assignment or Project:
Ho Chi Minh city Urban Railway Construction
Project (New Port- 8th District terminal) – Line 5, phase 2.
Year:4/2012 – 3/2015
Location: Ho Chi Minh city, Vietnam
Client:
Management
Authority for
Urban
Railways
Main Project Feature:
Feasibility Study and Basic Design stage
Metro line 5- stage 2 length is app. 14.5km crossing some districts, including: Binh Chanh, 8, 5, 10, 11 and Tan Binh. The Start-Point is located at Da Phuoc ward, Binh Chanh district; the End-Point is located at Bay Hien cross road and connect with line 5- stage
1 (start/ end point of stage 1). Detail as follow:
+ Underground:
8.8 km;
+ Elevated: 5.7 km;
+ Station: 13 (5- Elevated station and 8- underground);
+ Depot: Area app. 31.6ha (at Da Phuoc ward, Binh
Chanh district).

(5) Name of Assignment or Project
Ho Chi Minh City Urban Railway Construction Project
(Ben Thanh- Tham Luong) line 2, Phase 1.
Year : 2010 – 2011
Location: Ho Chi Minh city, Vietnam
Client : Management Authority for Urban Railways
Main Project Feature:
Feasibility Study and Basic Design stage.
Metro line 2- length is app. 11.332km crossing some districts, including: 1, 3, 10, 12 and Tan Binh, Tan Phu.
The Start-Point is located at Ben Thanh ward, district 1; the End-Point is located at Tan Thoi Nhat ward, district 12.
Detail as follow:
+ Underground:
9.315 km;
+ Elevated: 0.778 km;
+ Station: 11 (1- Elevated station and 10- underground);
+ Depot: Area app. 22.3ha (at Tan Thoi Nhat ward, district 12).
(6) Name of Assignment or Project
Ho Chi Minh City Urban Railway Construction
Project (Bridge Ben Cat- Nguyen Van Linh) line 4.
Year : 2010 – 2014
Location: Ho Chi Minh city, Vietnam
Client : Management Authority for Urban
Railways
(7) Name of Assignment or Project
Dong
Nai bridge construction project; repair, reinforcement, maintenance of the big Dong Nai and small Dong Nai
Year : 2012-2014
Location : Dong Nai, Vietnam
Client : Vietnam Railways

Main Project Feature:
Feasibility Study and Basic Design stage.
Metro line 4- length is app. 21km crossing some districts, including: Go Vap, Phu Nhuan, Tan Binh,
12, 4, 1, 3, 7 and Nha Be. The Start-Point is located at Thanh Xuan ward, district 12; the End-Point is located at Phuoc Kien ward, Nha Be district.
Detail as follow:
+ Underground:
17.74 km;
+ Elevated: 3.26 km;
+ Station: 20 (4- Elevated station and 16- underground)
Main Project Feature:
Working drawing design
Project includes 3 bridges and 2km road.
Superstructure; void slab girder 15m, 20m, 24m; PC-I girder 33m; … .
Total project cost is about 50 billion VND.

Position Held: Design/ Translator/ QC/ QA Engineer
Activities Performed:
– Surveying topographic, collecting project documents.
– General Plan, Detailed Design (plan, profile, typical structure and calculating quantity).
– Establish working drawings designing documents
– Establish and check, record the daily reports for the assigned construction areas.
– Manage the works in accordance with the works method and architectural details.
– Manage the works to ensure it are completed on time.
– Improve the quality of the operations process.
– Prepare all the reports and make presentations for client.
– Connect clients, related organizations and project members.

8. OTHERS INFORMATION (INTRODUCTION):
– Have knowledge related to Civil engineering.
– Ability in communication, coordination skills, and good command of written and spoken language.
– The hard work attitude, responsible spirit, teamwork spirit
– Proficient in office software: MS Office, CAD, Project software …
– Good English communication skills.
– Knowledge Vietnamese law in Civil engineering

9. CERTIFICATION:
I, the undersigned, certify that The “CV” is the best of my knowledge and belief. This “CV” describes correctly my qualifications and experience. I understand that if everything is wrong in “CV”, it was led to dismiss me.

Date: 02/04/2019
Full name
Day/Month/Year

Hoang Cong Ha

Skills

All in one