About me

CURRICULUM VITAE

Name: Nguyen Trung Hieu
Adress: 108/81, Tran Van Quang, 10 Ward,
Tan Binh District, HCM City, VietNam.
Mobile No: 090.110.3710
Birthday: 17 / 11 / 1979.
Email: mn.electric.mn@gmail.com

Present Position : Chief of Electrical Design team
Experience Position : Supervisor, Site Manager,
Project Manager.

SUMARY
Education :
Electrical – automatic engineer of Bach Khoa university, Project managment institute, six sigma, keizen, team building, customer service.
Project :
– Industrial : Unilever, Masan, Camau combine cycle power plant,
Binh Hung’s waste water treatment, Dong Nai province’s water treatment, IaPech Wind power plant, Tan Tan Nhat Wind Power
Plant.
– Air port : Dakha Air port (Bangladesh).
– Substation : Sounthern air traffic management, Ho Chi Minh museum…
– Highway : Long Thanh – Dau Giay.
– Hospital : Tan Hung general hospital.
– Kitchen : Sanfulou restaurant, Royal hotel, Nghi Son steel.
– M&E : Kinder star school, Song Than storage, CT7, CT8…
Employer :
Power China, Hitachi, Sky Team, OTV (French), Degremont (French),
Petro Vietnam…
Consultant :
Nippon (Japanese), NSC (Japanese), Poyry (Swiss)
Counterpart contractor :
Posco E&C (Korean), Siemens (Indonesia, Swiss), Torisima (Japanese),
Hitachi (Japanese)
Achivement :
– In charge for project from tender to design, installation, comission, hand – over.
– Project management.
– Innovation for management procedure
Skill :
– Strong technical background.
– Good negoation with suplier.
– Knowledgement about ISO, Keizen, Six sigma, Project management

EDUCATION/TRAINING:

From 1997 to 2002:
Electrical Engineer – Bach Khoa University (Ho Chi Minh City
University of Technology).
Jan 2010 to Dec 2010
Project Management – PMI (Project Management Institute)
Jun 2005 to Dec 2005:
Management Certificate of Economics University

WORK EXPERIENCE:

February 2019 to Present: Thanh Dat

Role : Chief of Electrical Design team

Job responsibilities:
– Making – Checking shops drawing, method statement, specification, inspection planning going to be submitted to ensure the work comply with the contract require.
– Meeting with other conractors, consultant, employer for good co – ordinate.

2017 to 2019: Jesco Asia

Role : Chief of Electrical Design team

Job responsibilities:
– Check shops drawing, method statement, specification, inspection planning going to be submitted to ensure the work comply with the contract require.
– Meeting with other conractors, consultant, employer for good co – ordinate.

February 2015 to 2017: Techgel

Role : Chief of Electrical Design team

Job responsibilities:
– Check shops drawing, method statement, specification, inspection planning going to be submitted to ensure the work comply with the contract require.
– Meeting with other conractors, consultant, employer for good co – ordinate.

October 2014 to February 2015: Sagomed (operation, health care supplier)

Role : Director assistant

Job responsibilities:
– Set up the Project managment procedure
– Set plan, schedule, balance resource with others project.
– Set up project team
– Trainning the skill for project team, assess project team performance.

May 2014 to September 2014: BTi (kitchen and washing supplier)

Role : Project Manager

Job responsibilities:
– Check shops drawing, method statement, specification, inspection planning going to be submitted to ensure the work comply with the contract require.
– Testing, commissioning, maintenance.
– Schedule progress, delaying factors, slippages and area of concern. Plan and initiate corrective actions.
– Due with suppliers about cost and payment.
– Review & report on the construction activities, progress reports, analyze and assesses
– Manage, balance cost in order to get the benefit target.
– Coordinate with Financial to balance the cash flow.
– Follow up and coordinate with Site Manager to ensure the schedule, quality.
– Follow up the procurement.
– Risk management.
– Planning, schedule, balance resource between project and other department.
– Assign the team member for Project.
– Assess team members, training, implement the human resource for project.
– Review and give advice on the systems, procedures and documentation set out for this project.
– Review weekly reports, monthly reports, chair M&E meetings.
– Attend M&E and co ordination meeting with contractors and consultants.
– Determine policy to manage quality for the Project.
– Manage staff and allocate clear responsibilities.
– Review design and report to Project Director any issue

July 2011 to November 2013: Quartz Mechanical & Electrical Corporation (QMC)

Role : Project Manager & M&E Manager

Job responsibilities:
– Check shops drawing, method statement, specification, inspection planning going to be submitted to ensure the work comply with the contract require.
– Testing, commissioning, maintenance.
– Schedule progress, delaying factors, slippages and area of concern. Plan and initiate corrective actions.
– Due with suppliers about cost and payment.
– Review & report on the construction activities, progress reports, analyze and assesses
– Manage, balance cost in order to get the benefit target.
– Coordinate with Financial to balance the cash flow.
– Follow up and coordinate with Site Manager to ensure the schedule, quality.
– Follow up the procurement.
– Risk management.
– Planning, schedule, balance resource between project and other department.
– Assign the team member for Project.
– Assess team members, training, implement the human resource for project.
– Review and give advice on the systems, procedures and documentation set out for this project.
– Review weekly reports, monthly reports, chair M&E meetings.
– Attend M&E and co ordination meeting with contractors and consultants.
– Determine policy to manage quality of M&E system for the Project.
– Manage staff and allocate clear responsibilities.
– Review M&E design and report to Project Director and Senior
Construction
– Manager on any issue relative to M&E design, M&E construction works.

Nov 2009 to May 2011 :
Tan Tien Automation Technology Corp (AIT)

Role: Site Manager – Electrical Design Supervisor
Job responsibilities:
– Check shops drawing, method statement, specification, inspection planning going to be submitted to ensure the work comply with the contract require.
– Control the construction schedule, construction progress to ensure it comply with other contractor.
– Check and update the Project Schedule.
– Review, analyse the resource and schedule on site to report and coordinate with Project Manager to assess delay factor in order to make corrective action if necessary.
– Testing, commissioning.
– Design for the Electrical system.

Feb 2006 to Oct 2009 :

LILAMA Corp.

Role: Electrical Supervisor

Job responsibilities:

– Checking design, installation procedure document submitted by sub contractors to ensure the complicate with contract and site condition.
– Assign team member to supervise, inspect in order to ensure the work of subcontractors comply with schedule, quality of the main contract.
– Make NCR and request subcontractor for corrective action.
– Make daily, weekly and/or Monthly Progress Reports for submission to
Site Manager.
– Checking all inspection documents.
– Checking As-built drawings.
– System in charge:
– Water treatment system.
– 220KV Switch yard.
– HVAC.
– Lighting system.
– Grounding, lightning system.
– Communication system.
– Fire alarm, Fire fighting system

From 2004 to 2006 :

IEA LTD.

Scope of work:

Design anf construct Concrete Mixer Station.

Design anf construct Scale Station.

Job responsibilities:

PLC programer.

Micro processor programer.

KEY SKILLS

Main Skill :

 Strong technical background.
 Good negotiation with Supplier, foreigner Contractor.
 Knowledgement about ISO system, Kaizen, Six Sigma

Communicate skill :
 The experience at work as well as outside meeting and negotiation ability has supported and improved my communicate skill effectively.
 Excellent communication skills
 Good relationship with Airport, EVN

Computer skills:

Ms Office (Word, Excel, Access).

Power Point.

Ms Project.

Outlook.

Autocad.

Orcad.
Langue skill :

Speaking, reading and writing English are fluent.

FAVOURITIES:

Reading.

Football.

Traveling

Team work
PERSONALITY:
 Sense of responsibility and carefulness in all the works are my strength.
 Friendly, Straight & Honesty.
REFERENCE:

Mr. Vu Dinh Chieu Huy – QMC Director
Phone : 090 8842 177

Mr. Nguyen Duy Loi – Project Director of Lilama Corporation
Phone : 0913 148 539

Mr. Nguyen Quang Phu – M&E Department Manager of HCM Flight Center.
Phone : 0908 241 437

Reference List of project takenover during working:
1. Tan Tan Nhat Wind Power Plant Project

Role : Chief of elctrical design team

Customer: Power China.
.

Scope of work: design for 110kV Substation, M&E system of Substation and
Operation building.
2. Iapech 1&2 Wind Power Plant Project

Role : Chief of elctrical design team

Customer: Power China.
.

Scope of work: design for 110kV Substation, M&E system of Substation and
Operation building.
3. Expension 110kV substionstion for SPC and PC Dong Nai

Role : Chief of elctrical design team

Customer: SPC, PC Dong Nai.

Scope of work: design for secondary circuit.
4. Long Thanh Dau Giay Highway

Role : Chief of elctrical design team

Customer: Hitachi.
.

Scope of work: design for LV distribution system, MV distribution system,
CATV, Fee payment station, Central control station.
5. Second Ho Chi Minh City Water Environment Improvement Project

Role : Chief of elctrical design team

Customer: Veolia Water.
.

Scope of work: design for LV distribution system, MV distribution system,
MCC.
6. Renovation For Electrical System

Role : Chief of elctrical design team

Customer: Nikkiso VietNam. .

Scope of work: design for LV distribution system, MV distribution system
7. Tan Hung hospital

Role : Site Manager

Customer: Tan Hung hospital .

Scope of work: EPC for operation, fresh air, medical airsupply

Duration: 11/2014 to 02/2015.
8. Nghi Son Steel

Role : Project Manager

Customer: Nghi Son steel (JGCS – Japanese).

Scope of work: supply and install canteen, washing – dryer system.

Duration: 07/2014 to 08/2014.
9. Sanfulou Chinese Restaurant

Role : Project Manager

Customer: A&B Concept.

Scope of work: supply and install equipment for restaurant and bar.

Duration: 08/2012 to 09/2014.
10. Medium voltage, Low voltage switchyard for Tan Son Nhat Air Port

Role : Project Manager


Customer: VietNam Air Traffic Management Corp.

Scope of work: building, procurement and installation for the medium voltage, low voltage power supply 560KVA 15(22)/0.4KV.

Duration: 09/2012 to 06/2013.
11. Medium voltage switchyard for Ho Chi Minh Museum

Role : Project Manager

Customer: Ho Chi Minh Museum

Scope of work: building, procurement and installation for the medium voltage power supply 400KVA 15(22)/0.4KV.

Duration: 06/2012 to 12/2012.

12. Medium voltage power supply for Can Tho Air Port

Role : Project Manager

Customer: VietNam Air Traffic Managment Corp.

Scope of work: procurement and installation medium voltage system.

Duration: 03/2012 to 06/2012.
13. Medium voltage power supply for Buon Me Thuot Air Port

Role : Project Manager

Customer: VietNam Air Traffic Management Corp.

Scope of work: procurement and installation medium voltage system.

Duration: 10/2011 to 04/2012.
14. Radar system (TRAC 2000) in Tan Son Nhat airport

Role : Project Manager

Customer: VietNam Air Traffic Management Corp.

Scope of work: procurement and installation medium voltage, low voltage power supply, air conditioning, Scada system.

Duration: 02/2011 to 09/2012.
15. Electrical power supply, access control, PA, camera, telephone, lighting, lightning, grounding

Role : Project Manager

Customer: Kinderstar Ltd..

Scope of work: procurement and installation electrical power supply, access control, PA, camera, telephone, lighting, lightning, grounding.

Duration: 02/2011 to 09/2011.
16. Procurement and installation electrical system for Kios, Storage No.1, Storage No.2

Role : Project Manager

Customer: CT SongThan Corp.

Scope of work : procurement and installation electrical system.

Duration: 07/2011 to 11/2011.
17. Tan Hiep water plan.

Role : Site Manager, Electrical Designer.

Customer: Tan Hiep Ltd.

Scope of work : design, procurement, installation, commissioning MV pơẻ supply system.

Duration: 09/2010 to 02/2011.
18. Nhon Trach water plant, 100.000M3/day.

Role : Site Manager, Electrical Designer.

Customer: Degremont Ltd.

Scope of work : design, procurement, installation, commissioning electrical system, SCADA system.

Duration: 02/2009 to 05/2011.
19. Combine Cycle Power Plant 2x750MW

Role : Supervisor

Customer: PVE.

Scope of work : EPC for Combine Cycle Power Plant.

Duration: 05/2006 to 09/2009

Skills