About Male 1979 Hồ Chí Minh ĐH Bách khoa TPHCM; ĐH Kinh tế quốc dân English POSCO; NIKKISO; UNILEVER; ELECTRICAL POWER 01_cvepmnop_pdf_1678003731.pdf
-
Academic Level Under Associate
-
Gender Male
-
Languages English
-
Old Provinces Tây Ninh;Cần Thơ;Đồng Nai;Hồ Chí Minh
-
Old YOB 1979<
-
Viewed 12
About me
CURRICULUM VITAE
Name: Nguyen Trung Hieu
Adress: 108/81, Tran Van Quang, 10 Ward,
Tan Binh District, HCM City, VietNam.
Mobile No: 090.110.3710
Birthday: 17 / 11 / 1979.
Email: mn.electric.mn@gmail.com
Present Position : Chief of Electrical Design team
Experience Position : Supervisor, Site Manager,
Project Manager.
SUMARY
Education :
Electrical – automatic engineer of Bach Khoa university, Project managment institute, six sigma, keizen, team building, customer service.
Project :
– Industrial : Unilever, Masan, Camau combine cycle power plant,
Binh Hung’s waste water treatment, Dong Nai province’s water treatment, IaPech Wind power plant, Tan Tan Nhat Wind Power
Plant.
– Air port : Dakha Air port (Bangladesh).
– Substation : Sounthern air traffic management, Ho Chi Minh museum…
– Highway : Long Thanh – Dau Giay.
– Hospital : Tan Hung general hospital.
– Kitchen : Sanfulou restaurant, Royal hotel, Nghi Son steel.
– M&E : Kinder star school, Song Than storage, CT7, CT8…
Employer :
Power China, Hitachi, Sky Team, OTV (French), Degremont (French),
Petro Vietnam…
Consultant :
Nippon (Japanese), NSC (Japanese), Poyry (Swiss)
Counterpart contractor :
Posco E&C (Korean), Siemens (Indonesia, Swiss), Torisima (Japanese),
Hitachi (Japanese)
Achivement :
– In charge for project from tender to design, installation, comission, hand – over.
– Project management.
– Innovation for management procedure
Skill :
– Strong technical background.
– Good negoation with suplier.
– Knowledgement about ISO, Keizen, Six sigma, Project management
EDUCATION/TRAINING:
From 1997 to 2002:
Electrical Engineer – Bach Khoa University (Ho Chi Minh City
University of Technology).
Jan 2010 to Dec 2010
Project Management – PMI (Project Management Institute)
Jun 2005 to Dec 2005:
Management Certificate of Economics University
WORK EXPERIENCE:
February 2019 to Present: Thanh Dat
Role : Chief of Electrical Design team
Job responsibilities:
– Making – Checking shops drawing, method statement, specification, inspection planning going to be submitted to ensure the work comply with the contract require.
– Meeting with other conractors, consultant, employer for good co – ordinate.
2017 to 2019: Jesco Asia
Role : Chief of Electrical Design team
Job responsibilities:
– Check shops drawing, method statement, specification, inspection planning going to be submitted to ensure the work comply with the contract require.
– Meeting with other conractors, consultant, employer for good co – ordinate.
February 2015 to 2017: Techgel
Role : Chief of Electrical Design team
Job responsibilities:
– Check shops drawing, method statement, specification, inspection planning going to be submitted to ensure the work comply with the contract require.
– Meeting with other conractors, consultant, employer for good co – ordinate.
October 2014 to February 2015: Sagomed (operation, health care supplier)
Role : Director assistant
Job responsibilities:
– Set up the Project managment procedure
– Set plan, schedule, balance resource with others project.
– Set up project team
– Trainning the skill for project team, assess project team performance.
May 2014 to September 2014: BTi (kitchen and washing supplier)
Role : Project Manager
Job responsibilities:
– Check shops drawing, method statement, specification, inspection planning going to be submitted to ensure the work comply with the contract require.
– Testing, commissioning, maintenance.
– Schedule progress, delaying factors, slippages and area of concern. Plan and initiate corrective actions.
– Due with suppliers about cost and payment.
– Review & report on the construction activities, progress reports, analyze and assesses
– Manage, balance cost in order to get the benefit target.
– Coordinate with Financial to balance the cash flow.
– Follow up and coordinate with Site Manager to ensure the schedule, quality.
– Follow up the procurement.
– Risk management.
– Planning, schedule, balance resource between project and other department.
– Assign the team member for Project.
– Assess team members, training, implement the human resource for project.
– Review and give advice on the systems, procedures and documentation set out for this project.
– Review weekly reports, monthly reports, chair M&E meetings.
– Attend M&E and co ordination meeting with contractors and consultants.
– Determine policy to manage quality for the Project.
– Manage staff and allocate clear responsibilities.
– Review design and report to Project Director any issue
July 2011 to November 2013: Quartz Mechanical & Electrical Corporation (QMC)
Role : Project Manager & M&E Manager
Job responsibilities:
– Check shops drawing, method statement, specification, inspection planning going to be submitted to ensure the work comply with the contract require.
– Testing, commissioning, maintenance.
– Schedule progress, delaying factors, slippages and area of concern. Plan and initiate corrective actions.
– Due with suppliers about cost and payment.
– Review & report on the construction activities, progress reports, analyze and assesses
– Manage, balance cost in order to get the benefit target.
– Coordinate with Financial to balance the cash flow.
– Follow up and coordinate with Site Manager to ensure the schedule, quality.
– Follow up the procurement.
– Risk management.
– Planning, schedule, balance resource between project and other department.
– Assign the team member for Project.
– Assess team members, training, implement the human resource for project.
– Review and give advice on the systems, procedures and documentation set out for this project.
– Review weekly reports, monthly reports, chair M&E meetings.
– Attend M&E and co ordination meeting with contractors and consultants.
– Determine policy to manage quality of M&E system for the Project.
– Manage staff and allocate clear responsibilities.
– Review M&E design and report to Project Director and Senior
Construction
– Manager on any issue relative to M&E design, M&E construction works.
Nov 2009 to May 2011 :
Tan Tien Automation Technology Corp (AIT)
Role: Site Manager – Electrical Design Supervisor
Job responsibilities:
– Check shops drawing, method statement, specification, inspection planning going to be submitted to ensure the work comply with the contract require.
– Control the construction schedule, construction progress to ensure it comply with other contractor.
– Check and update the Project Schedule.
– Review, analyse the resource and schedule on site to report and coordinate with Project Manager to assess delay factor in order to make corrective action if necessary.
– Testing, commissioning.
– Design for the Electrical system.
Feb 2006 to Oct 2009 :
LILAMA Corp.
Role: Electrical Supervisor
Job responsibilities:
– Checking design, installation procedure document submitted by sub contractors to ensure the complicate with contract and site condition.
– Assign team member to supervise, inspect in order to ensure the work of subcontractors comply with schedule, quality of the main contract.
– Make NCR and request subcontractor for corrective action.
– Make daily, weekly and/or Monthly Progress Reports for submission to
Site Manager.
– Checking all inspection documents.
– Checking As-built drawings.
– System in charge:
– Water treatment system.
– 220KV Switch yard.
– HVAC.
– Lighting system.
– Grounding, lightning system.
– Communication system.
– Fire alarm, Fire fighting system
From 2004 to 2006 :
IEA LTD.
Scope of work:
Design anf construct Concrete Mixer Station.
Design anf construct Scale Station.
Job responsibilities:
PLC programer.
Micro processor programer.
KEY SKILLS
Main Skill :
Strong technical background.
Good negotiation with Supplier, foreigner Contractor.
Knowledgement about ISO system, Kaizen, Six Sigma
Communicate skill :
The experience at work as well as outside meeting and negotiation ability has supported and improved my communicate skill effectively.
Excellent communication skills
Good relationship with Airport, EVN
Computer skills:
Ms Office (Word, Excel, Access).
Power Point.
Ms Project.
Outlook.
Autocad.
Orcad.
Langue skill :
Speaking, reading and writing English are fluent.
FAVOURITIES:
Reading.
Football.
Traveling
Team work
PERSONALITY:
Sense of responsibility and carefulness in all the works are my strength.
Friendly, Straight & Honesty.
REFERENCE:
Mr. Vu Dinh Chieu Huy – QMC Director
Phone : 090 8842 177
Mr. Nguyen Duy Loi – Project Director of Lilama Corporation
Phone : 0913 148 539
Mr. Nguyen Quang Phu – M&E Department Manager of HCM Flight Center.
Phone : 0908 241 437
Reference List of project takenover during working:
1. Tan Tan Nhat Wind Power Plant Project
Role : Chief of elctrical design team
Customer: Power China.
.
Scope of work: design for 110kV Substation, M&E system of Substation and
Operation building.
2. Iapech 1&2 Wind Power Plant Project
Role : Chief of elctrical design team
Customer: Power China.
.
Scope of work: design for 110kV Substation, M&E system of Substation and
Operation building.
3. Expension 110kV substionstion for SPC and PC Dong Nai
Role : Chief of elctrical design team
Customer: SPC, PC Dong Nai.
Scope of work: design for secondary circuit.
4. Long Thanh Dau Giay Highway
Role : Chief of elctrical design team
Customer: Hitachi.
.
Scope of work: design for LV distribution system, MV distribution system,
CATV, Fee payment station, Central control station.
5. Second Ho Chi Minh City Water Environment Improvement Project
Role : Chief of elctrical design team
Customer: Veolia Water.
.
Scope of work: design for LV distribution system, MV distribution system,
MCC.
6. Renovation For Electrical System
Role : Chief of elctrical design team
Customer: Nikkiso VietNam. .
Scope of work: design for LV distribution system, MV distribution system
7. Tan Hung hospital
Role : Site Manager
Customer: Tan Hung hospital .
Scope of work: EPC for operation, fresh air, medical airsupply
Duration: 11/2014 to 02/2015.
8. Nghi Son Steel
Role : Project Manager
Customer: Nghi Son steel (JGCS – Japanese).
Scope of work: supply and install canteen, washing – dryer system.
Duration: 07/2014 to 08/2014.
9. Sanfulou Chinese Restaurant
Role : Project Manager
Customer: A&B Concept.
Scope of work: supply and install equipment for restaurant and bar.
Duration: 08/2012 to 09/2014.
10. Medium voltage, Low voltage switchyard for Tan Son Nhat Air Port
Role : Project Manager
Customer: VietNam Air Traffic Management Corp.
Scope of work: building, procurement and installation for the medium voltage, low voltage power supply 560KVA 15(22)/0.4KV.
Duration: 09/2012 to 06/2013.
11. Medium voltage switchyard for Ho Chi Minh Museum
Role : Project Manager
Customer: Ho Chi Minh Museum
Scope of work: building, procurement and installation for the medium voltage power supply 400KVA 15(22)/0.4KV.
Duration: 06/2012 to 12/2012.
12. Medium voltage power supply for Can Tho Air Port
Role : Project Manager
Customer: VietNam Air Traffic Managment Corp.
Scope of work: procurement and installation medium voltage system.
Duration: 03/2012 to 06/2012.
13. Medium voltage power supply for Buon Me Thuot Air Port
Role : Project Manager
Customer: VietNam Air Traffic Management Corp.
Scope of work: procurement and installation medium voltage system.
Duration: 10/2011 to 04/2012.
14. Radar system (TRAC 2000) in Tan Son Nhat airport
Role : Project Manager
Customer: VietNam Air Traffic Management Corp.
Scope of work: procurement and installation medium voltage, low voltage power supply, air conditioning, Scada system.
Duration: 02/2011 to 09/2012.
15. Electrical power supply, access control, PA, camera, telephone, lighting, lightning, grounding
Role : Project Manager
Customer: Kinderstar Ltd..
Scope of work: procurement and installation electrical power supply, access control, PA, camera, telephone, lighting, lightning, grounding.
Duration: 02/2011 to 09/2011.
16. Procurement and installation electrical system for Kios, Storage No.1, Storage No.2
Role : Project Manager
Customer: CT SongThan Corp.
Scope of work : procurement and installation electrical system.
Duration: 07/2011 to 11/2011.
17. Tan Hiep water plan.
Role : Site Manager, Electrical Designer.
Customer: Tan Hiep Ltd.
Scope of work : design, procurement, installation, commissioning MV pơẻ supply system.
Duration: 09/2010 to 02/2011.
18. Nhon Trach water plant, 100.000M3/day.
Role : Site Manager, Electrical Designer.
Customer: Degremont Ltd.
Scope of work : design, procurement, installation, commissioning electrical system, SCADA system.
Duration: 02/2009 to 05/2011.
19. Combine Cycle Power Plant 2x750MW
Role : Supervisor
Customer: PVE.
Scope of work : EPC for Combine Cycle Power Plant.
Duration: 05/2006 to 09/2009