About Male 1984 Hồ Chí Minh 1511085277_cv_mr.hthang.pdf

  • Academic Level  College
  • Gender  Male
  • Old YOB  1980-1986
  • Viewed 8

About me

CURRICULUM VITAE
1. Position applied for/
Chief of Project Engineer
2. Personal information.
Full name : Nguyen Hong Thang
Date of birth : 20/04/1984
Height :
1.65m
Weight
: 65 Kg
Current address : Ho Chi Minh City
Place of birth :
Permanent address : Ho Chi Minh City
Quang Ngai Province
Tel : 0982.897.725

Email address: huu_thang69@yahoo.com

3. Education.
School attended and location.
From
To
Certificates obtain.
Dung Quat Vocational College Of
Technique And Technology
10/2003
09/2005
Petrochemical
University & Location
From
To
Degree
Major subject
Graduated from University of Transport in HCMC
09/ 2005
12/ 2009
Engineer

Mechanical
Engineering

4. Other types of course or training completed.
Course’s name
Company training.
Time
QC Level 3 (New 7 QC Tools)
VJQC
01/10/2015-
10/10/2015
Radiographic, UT, MT, PT Testing
KoBe EN&M VietNam
05/2013-11/2013
Quality control system training program.(ISO 9001, API 5L, API Q1,
API 2B…)

API
03/08/2014
08/08/2014

Environment control system training program.(ISO 14001:2004)

LRQA
16/07/2012-
19/07/2012

Occupational
Health
&
Safety
Assessment
Series.(OHSAS
18001:2000)

BV
03/09/2015-
06/09/2015
Lab Inspector, 7 QC Tools
Quatest 3
10/2013 -12/2013
Lead Auditor
BSI
18/11/2014-
25/11/2014
Welding inspector
PV Pipe
01/2015
5. Skill.
Foreign languages.

English
Listening
Speaking
Reading
Writing

Computer
Ms. Word
Ms.Exel
Autocad
:2D,3D
Powerpoint

6. Work experience.
I have eight years of working experience in many project such as: Oil & Gas industry project, steel production plant project, building project, etc.
I also experienced in coordinating with the Inspection/Supervision of contractor and subcontractor and client on all document pertaining to QA/QC program in project.
Start with your most recent employer.
Company
Job tittle
From
To
POSCO E&C VIỆT NAM
Chief QA/QC
11/2016
Present
Describe your main duties and responsibilities.
– Develop QA&QC procedure, checklist for construction sector
– Review and setup quality inspection categories for each of works (materials, procurement, construction).
– Develop and review all method statement relating to construction works.
– Writing QA&QC plan for site and for execution.
– Building Quality plan for ITP requirements.
– Conduct quality management and quality internal audit, ensure NCR(s) is closed at internal planned and corrective action to be finalized.
– Operate internal training relating to quality to all relevant department.
– Set up quality objectives and monitor the effectiveness and performance.
– Update legal requirement relevant to construction sector.
– Set up defect database and countermeasure for improvement.
– Perform all daily inspection and test of the scope and character necessary to achive the quality of construction required in the drawing and specifications for all works under the contract performed
ON or OFF site.
– Review tender submissions and prepare tender reports.
– Taking care QA/QC documents of the entrie project including: certificates, calibration, test results, inspection requests, non-compliance reports and site instruction.
– Carry out inspection and checking for all quality related procedures in the site and ensure activity at the site are as per approved method statement and inspection test plan.
PetroVietNam Steel Pipe JSC
(PV Pipe)
QA/QC Engineer
04/2014
11/2016
Describe your main duties and responsibilities.
– Monitoring material input.
– Supporting supervisor & engineer to prepare & test WPS.
– Checking welding machine, measuring equipment in suitable condition and calibrated as appropriate.
– Checking dimension/ welding quality following drawing & code approved by client.
– To make plan for NDT (UT, RT, PT & MT) testing following work instruction.
– To make Inspection Testing Plan for third party & customer inspector.
– To make MPS ( Manufacturing Procedure Specification).
– Supporting Manager to make nonconformity record (NCR).
– Checking welder & consumable in accordance with client’s spec.
– To support manager to prepare before customer audit.
– To checking coating condition after completing.
– Preparing and reviewing, administer and implement Quality Assurance Plans, Inspection Test
Plans and other Operation procedures
– Work closely with customer, production and suppliers to meet the quality requirements
– Managing of customer complaints, corrective and preventive action program
– Responsible for product quality management, implement quality plans, drive quality improvement projects and prepare quality report to identify problem areas and work on problem resolutions.
– Responsible of handling the customer quality/customer satisfaction issues
– Working closely with internal team members and external suppliers to address product-related quality issues, and drive corrective and prevent actions for continuous improvement

Company

Job tittle

From

To
KOBE EN&M VietNam Co.,LTD
QA/QC
Engineer
03/2012
03/2014
Describe your main duties and responsibilities.
– Checking material input at site.
– Checking fit-up before welding in accordance with drawing.
– Checking welding equipment in suitable condition and calibrated.
– Checking identification of welder qualified for each WPS to be used, all welder qualification certificates are valid.
– To ensure that all consumables are store/ oven and quiver suitable QC procedure.
– Checking welding parameters in accordance with WPS.
– Checking dimension following drawing.
– Checking Visual after completing.
– Monitoring PWHT (Check chart record) for compliance with procedure.
– To monitoring Hydrostatic testing for Piping and Vessel.
– To control manpower at site.
– To support inspector to qualified welder in accordance with AWS D1.1 and ASME -IX.
Company
Job tittle
From
To
P.S.T
Techno
Engineering
Co.,LTD
QA/QC
Engineer
03/2009
02/2012
– Develop QA&QC procedure, checklist for construction sector
– Review and setup quality inspection categories for each of works (materials, procurement, construction).
– Develop and review all method statement relating to construction works.
– Writing QA&QC plan for site and for execution.
– Building Quality plan for ITB requirements.
– Conduct quality management and quality internal audit, ensure NCR(s) is closed at interval planned and corrective action to be finalized.
– Operate internal training relating to quality to all relevant department.
– Set up defect database and countermeasure for improvement.
– Organize for the third parties certification audit and inspection.

7. Others
Joining mainly projects
– Bach Ho Gas pipeline Project
– H24 Project
– The Nassim project
– The Oriental Garden Project
– Nam Con Son 2 Gas pipeline Project
– Nhon Trach 2 Power Project
– Nippon Steel at Thailand Project
– Tigar 50TPD Prototype Plat of IHI Corporation
– Heat Exchanger Equipment of Idemitsu Kosan Co.,LTD….
Code & Specification
– JIS A 5525 Specification for pipe pile steel, JIS A 5530 Specification for pipe pile steel.
– ASME-IX Welding & Brazing qualification WPS & PQR
– AWS D1.1 Steel structure welding
– API 5L, 2B Specifiacation for line pipe
– DNV OS F101, Submarine pipe line system…
– ASTM, BS, TCVN….
Date : 2017/11/18………………….
Signature:
Name: Nguyen Hong Thang

Skills

All in one